CampGuide Host
Log inRequest an invitation
CampGuideThe Picnic TableDaily operationsHow do you plan campground maintenance?

How do you plan campground maintenance?

The pool pump that puts itself back on the schedule every 90 days.

Put the schedule on the equipment rather than in your head: pool pump every 90 days, gate arm every 60, water heater every spring, cart on hours. Overnight, anything coming due becomes a real work order with an assignee already on it, so campground preventive maintenance happens whether or not anyone remembered.

The pool pump gets serviced every 90 days. You know that in April, when you are standing next to it with the manual open. By late July it is one of forty things, the pressure is fine, and the last person who thought about it was you, in April.

Preventive maintenance at a campground fails for an unglamorous reason. It is not that people do not care about the pump. It is that the interval lives in somebody's head, and heads are full in July.

Where should the service interval live?

The fix is to stop holding the schedule and let the asset hold it. Pool pump every 90 days. Gate arm every 60. Shower house water heater every spring. Golf cart 3 every 100 hours. Enter it once, when you are calm, in April.

Then the useful part: overnight, anything coming due turns into a real work order with an assignee already on it. Not a reminder, not an email to nobody in particular. The same kind of job the crew already works, sitting in the same queue.

What happens on day 90?

At 2:00 in the morning the work order is written and assigned. At 7:00 Marcus opens his phone with his coffee and the pump service is on his list between the leaking spigot and a screen door. He does the pump because it is on the list, not because he remembered the pump.

Nobody had a meeting about the pump. Nobody wrote a note on the back of an envelope. The season's worth of preventive work happens the same way the reactive work does, which is the only way it happens at all.

Should preventive work look different?

Preventive work that lives in its own module gets its own habits, and habits that only apply to one corner of the software do not survive a busy August. Generated jobs carry the same statuses, the same parts, the same photos and the same costs as the ones your staff write by hand. Your maintenance spend for the year is one number, not two.

What if you run more than one park?

Every park's due and overdue work lands on the same board, so a manager covering two properties has one thing to look at in the morning. You can still open a single park and see only its list, which is what the person standing in that park wants.

The five schedules most parks want first

  • Pool and spa equipment, on the interval your state inspector already cares about.
  • Water heaters and pump houses, before the first cold week rather than during it.
  • Gate arms and access hardware, which fail at 11 p.m. on a Friday.
  • Golf carts and mowers, on hours instead of dates.
  • Fire rings, picnic tables and pedestals, on a walk-the-loop schedule in the shoulder season.

Questions operators ask.

Pool and spa equipment on the interval your inspector already cares about, water heaters and pump houses before the cold, gate arms and access hardware, carts and mowers on hours, and a shoulder-season walk of rings, tables and pedestals.

Bring your park to CampGuide.

We set up your rates, map and policies with you, and you pick the date you go live.